A Guaranteed Maximum Price contract sounds like exactly what it promises: a ceiling on what you will pay. In practice, the guarantee is only as strong as the language that defines it. Jacksonville hospital construction and large commercial projects run on GMP contracts. So do the deals where owners find themselves paying more than the "maximum" because the contingency language was loose and the GC knew how to use it.

This guide breaks down what a GMP contract actually contains, how the money flows, and when you should walk away from GMP in favor of a fixed-price arrangement.

Abstract plan sheets, ruler, dark laptop, blank clipboard, and hardhat on a jobsite trailer table
Editorial illustrationA shared preconstruction table establishes the drawings and cost records needed to compare contract structures before a GMP is accepted.

Step 1: Define GMP vs. Fixed-Price vs. Cost-Plus

These three contract types put cost risk in different places.

Fixed-price (lump sum): The GC commits to a specific price for a specific scope. If the work costs more than expected, the GC absorbs it. If it costs less, the GC keeps the savings. Risk sits with the contractor.

Cost-plus: The owner pays actual cost of construction plus a fee (percentage or fixed). The GC has no incentive to control costs, and the owner carries all cost risk. Rarely appropriate for owners who are not also acting as their own construction manager.

Guaranteed Maximum Price (GMP): A hybrid. The GC establishes a cost ceiling. Below that ceiling, the owner pays actual costs plus a fee. If costs exceed the GMP, the GC absorbs the overage -- in theory. In practice, the contingency provisions and change order rights often allow the GC to raise the GMP before the project is complete.

Pro tip: When a GC proposes GMP on a project where the design is already fully complete, push back. GMP is appropriate when design is incomplete and scope is genuinely uncertain. On a fully designed project, there is no reason the GC cannot offer a fixed-price contract.

Step 2: Understand the Four Sections of a GMP Contract

Every GMP contract has four core components. Know what each one means before you sign.

1. Fee: The GC's profit. Typically 3% to 8% of cost of work on large commercial projects, depending on project complexity and risk. This is non-negotiable once work starts, so negotiate it at award.

2. General Conditions: The GC's cost of managing the project: superintendent salary, project manager time, site trailer, temporary utilities, insurance, bond premium. General conditions are often where GCs bury cost without scrutiny. A vague general conditions budget is a red flag.

3. Estimated Cost of Work: The direct cost of labor, materials, and subcontractors. This is the main variable. On a GMP, the GC estimates this based on available design documents and carries contingency to cover gaps.

4. Contingency: A reserve for cost uncertainty. This is the most negotiated and most misunderstood section of a GMP contract.

Warning: A GMP with general conditions described only as a lump sum rather than a detailed line-item budget gives the GC enormous flexibility to shift costs. Require an itemized general conditions budget before signing.

Blank estimate grids, finish samples, scale ruler, pencil, and calculator on a planning table
Editorial illustrationEstimate grids and a calculator show how contingency pools must be separated, capped, and traced to defined construction costs.

Step 3: How Contingency Pools Work

Most GMP contracts have two contingency pools. Understanding who controls each pool determines how much of the "maximum" is actually guaranteed.

GC Contingency: Controlled by the GC. Used to cover cost growth within the GC's original scope -- estimating errors, subcontractor buyout savings that get spent elsewhere, efficiency losses. The GC can draw on this without owner approval. At the end of the project, GC contingency savings are typically split according to a negotiated sharing ratio (see Step 5).

Owner Contingency: Controlled by the owner. Used for scope changes, design development changes, and owner-directed additions. The GC cannot draw on owner contingency without written owner authorization.

Pro tip: Negotiate a hard cap on GC contingency as a percentage of the cost of work (typically 3% to 5%). A GC contingency of 10% on a $10 million project is $1 million of money that the GC can spend with limited accountability.

Step 4: What "Open-Book" Means in Practice

GMP contracts are typically described as "open-book," meaning the GC shares actual cost data with the owner. In practice, open-book ranges from genuinely transparent to technically compliant but useless.

Genuine open-book access means:

Technical compliance looks like:

Warning: If your GMP contract does not specify the format and frequency of cost reporting in the contract documents themselves, it will default to whatever level of detail the GC finds convenient.

Step 5: How Savings Are Shared

If the project comes in under the GMP, the savings sharing provision determines who keeps the difference between the GMP ceiling and actual cost. This is one of the most negotiated provisions in a GMP contract.

Common structures:

Pro tip: Savings sharing is most meaningful when the GMP is set early and scope is well-defined. A GMP set with incomplete design documents and then supplemented by dozens of change orders as design develops leaves little room for savings.

Step 6: When GMP Is Appropriate vs. Fixed-Price

GMP is appropriate when:

Fixed-price is appropriate when:

In Jacksonville, GMP is standard for hospital construction and large institutional projects where the design team and GC overlap during the pre-construction phase. For ground-up commercial construction with complete documents, JK Prestige Construction delivers fixed-price contracts that put the cost risk where it belongs -- with the contractor.

Step 7: Red Flags in a GMP Contract

Before signing a GMP contract, check for these specific problems:

High contingency with vague definition: A GMP contingency above 5% of cost of work without a detailed breakdown of what it covers is a sign the GC is padding the maximum price.

Vague general conditions: If the general conditions section is a single lump sum rather than an itemized budget, negotiate a line-item breakdown before signing. Superintendent cost alone should be a discrete line.

Broad change order rights: Some GMP contracts allow the GC to increase the GMP for "design development changes" even when no scope has been added. Define exactly what triggers a GMP amendment.

No savings sharing provision: If the contract is silent on what happens when the project comes in under the GMP, the GC keeps everything. Do not let this go unaddressed.

GC contingency controlled jointly: Some contracts give the GC contingency to the GC but require owner notification rather than owner approval before drawdown. That is better than nothing but still leaves you reacting rather than approving.

Pro tip: Have a construction attorney review any GMP contract above $500,000 before signing. The fee is small relative to the exposure. For commercial projects in Jacksonville, this is standard practice for sophisticated owners.

Blank project board, rolled plans, finish samples, and measuring tools on a framed interior workbench
Editorial illustrationOrganized scope records support quarterly review of contingency draws, change orders, buyout savings, and general conditions.

Step 8: What to Audit Quarterly on a GMP Project

Once a GMP project is underway, set a quarterly audit cadence. Review the following:

At JK Prestige Construction, fixed-price contracts eliminate most of this audit burden by putting cost risk with the contractor from day one. For projects where GMP is the appropriate delivery method, the same transparency principles apply.

Get a written estimate in 48 hours -- call (904) 944-0278 or request a consultation.

Get a written estimate in 48 hours.

No call center. No coordinator. A JK principal reviews every inquiry and replies with a real number, not a range, not a follow-up form.

Request Free Estimate →

Frequently Asked Questions

Can a GC exceed the GMP?
Not without owner authorization via a GMP amendment. However, broad change order rights and loose contingency definitions can effectively allow the GC to raise the GMP without the owner fully understanding what they have approved. Read every change order before signing.
Is GMP the same as a fixed-price contract?
No. A fixed-price contract sets a price for a defined scope and the GC keeps any savings. A GMP sets a cost ceiling with a sharing provision for savings, and the owner pays actual costs up to that ceiling. Risk allocation is different in both directions.
What is the typical GC fee on a GMP project in Jacksonville?
On large commercial and institutional projects in Jacksonville, GC fees typically range from 3% to 6% of cost of work, depending on project complexity and the GC's pre-construction contribution. Fees above 8% on a straightforward project warrant negotiation.
How does open-book accounting work with subcontractors?
On a genuine open-book GMP, you should be able to see every subcontractor invoice and the corresponding payment. The GC's markup on subcontractor work is limited to the agreed fee structure. If the GC is marking up subcontractor invoices outside the fee structure, that is a billing problem.
Should I hire an owner's representative for a GMP project?
For GMP projects above $2 million, an owner's representative who reviews monthly cost reports, attends owner-GC-architect meetings, and monitors the contingency logs is worth the cost. The owner's rep typically charges 1% to 3% of construction cost and often saves multiples of that in contingency and change order management.